Ezee TORQ MK II Manuel du propriétaire

Naviguer en ligne ou télécharger Manuel du propriétaire pour Bicyclettes Ezee TORQ MK II. ezee TORQ MK II Owner`s manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - P/N 015885

rev 2013-12-02P/N 01588518'-30' Diameter Batch / Continuous FlowCONSTRUCTION AND OWNER’S MANUAL

Page 2

10015885 rev 10-00Minimum conductor clearancesNO OVERHEAD CONDUCTORS100'MINCLEARANCE100'MIN.100'MINCLEARANCE100'MIN.100' MIN.

Page 3 - Table of Contents

11015885 rev 10-00ADDITIONAL SAFETY RECOMMENDATIONSA. You may decide to buy and install “auxiliary equipment” made by other manufacturers. MFS/YORK/ST

Page 4 - Warranty

12015885 rev 10-00SpecificationsThis bin is designed along guidelines which allow it to provide the owner years of serviceprovided it is not used for

Page 5 - Maintenance

13015885 rev 10-00Specifications, cont’dDOORSOn 2.66” corrugated bins, a single ring 32” door is standard on all sizes and a two ring 64”walk door is

Page 6 - Important Safety Information

14015885 rev 10-001.Bin capacities are approximate figures. The capacities shown above are based on 1.25 cubicfeet per bushel and a compaction factor

Page 7 - OPERATOR QUALIFICATIONS

15015885 rev 10-00CHECK DELIVERYYour bin has been carefully checked before shipment. However, you should check yourshipment upon arrival using the Pac

Page 8 - Decal I.D. & Placement

16015885 rev 10-00Site Location and ConcreteCHECK YOUR SITE FOR POSSIBLE PROBLEMS WITH:1. Local Codes and/or Permits 6. Seismic load2. Power lines 7.

Page 9

17015885 rev 10-00FOUNDATION NOTES:1. The foundation site should be well drained and free of vegetation and/or debris.2. Foundation(s) should be on un

Page 10 - 015885 rev 10-00

18015885 rev 10-00Foundation Plan ViewFoundation Cross SectionFoundation PlanC 1dia “A”dia “B”C 5

Page 11

19015885 rev 10-00FOUNDATION SPECIFICATIONSAnchor Bolt DataConcrete & Rebar Dataup to 9 1/2 RingsConcrete & Rebar Dataup to 11 1/2 RingsBin Di

Page 12 - Specifications

015885 rev 10-002The Symbol shown below is used to call your attention to instructionsconcerning your personal safety. Watch this symbol - it points o

Page 13 - DESIGN CRITERIA

20015885 rev 10-00Important Pre-Assembly InfoSIDEWALL SHEET IDENTIFICATIONThe bin wall sheets are color coded on the end of the sheets for easy refere

Page 14 - EZEE DRY BIN CAPACITY TABLE

21015885 rev 10-00Bin Hardware, cont’d3/8” x 1” Hex bolts, flat washers and nutsUsed to assemble the fan platformUsed at the winch on batch units1/2”

Page 15 - SIDEWALL SHEET IDENTIFICATION

22015885 rev 10-00GENERAL ASSEMBLY INSTRUCTIONS1. Build the top two full height sidewall rings.2. Install the tension angle segments.3. Locate the sig

Page 16 - Site Location and Concrete

23015885 rev 10-00Prior to construction, care must be taken to decide where all the accessories will be located.Below is a typical site layout showing

Page 17 - FOUNDATION NOTES:

24015885 rev 10-00Dryer Parts Identificationgrain band postnarrow grain bandgrain bandperforated grain bandperf band clipbrace channel bracketcenter b

Page 18 - Foundation Plan

25015885 rev 10-00Assembling the BinSTEP 1Sort the sidewall sheets according to the layout shown in this manual (page 48 - 49) bygage according to col

Page 19 - FOUNDATION SPECIFICATIONS

26015885 rev 10-00aSTEP 3Build the first full width sidewall ring from the topon the ring just completed. The vertical sheet seamof this ring should f

Page 20 - Important Pre-Assembly Info

27015885 rev 10-003/4"REFLeave this bolt out forthe splice.1/4" REFNOTE: The bottom of thesidewall should restapproximately 1/4"off of

Page 21 - MFS/YORK/STORMOR

28015885 rev 10-003' 9"3'-9"1'-9"2'-3 11/32"STEP 7Referring to Fig. a, install the plenum sheetsupport angle i

Page 22 - GENERAL ASSEMBLY INSTRUCTIONS

29015885 rev 10-00STEP 9Install the perforated plenum roof sheets over therafters by pushing the corresponding rib holes overthe inverted long bolts i

Page 23

015885 rev 10-003PREFACEYou have purchased the finest roof dryer and grain storage bin manufactured today. Thefollowing information is intended as a g

Page 24 - Dryer Parts Identification

30015885 rev 10-00DiaInner Ring 2nd Ring 3rd RingPart No. Size Qty Part No. Size Qty Part No. Size Qty18'&27'015097 18" x 90"

Page 25 - Assembling the Bin

31015885 rev 10-0045"45"5"7"4"10"6"32"20"10"7"7"30"16"10"4"10"16&

Page 26

32015885 rev 10-00STEP 11Roof Position: Eave clips allow the roof tobe installed in an elevated or closed position.The elevated position can be used f

Page 27 - NOTE: The bottom of the

33015885 rev 10-0021’ DIAMETER ROOF1. Install the first eave clip starting with the first square hole in clip as shown in figures a and b.2. Skip (4)

Page 28 - 2'-3 11/32"

34015885 rev 10-00CHART 1Bin DiameterHgt. AboveConcrete18' 134 3/4"21' 146 1/4"24" 157 5/8"27' 169 1/8"30&apos

Page 30

36015885 rev 10-00STEP 16In addition to the top row of rib bolts, leaveout every fourth bolt from the second rowof rib bolts. This will be used for th

Page 31 - 10 1/2"

37015885 rev 10-00120°STEP 19Bolt the roof cap slide rod brackets to the roofcap with 5/16” x 1” bin bolts and flange nuts(fig. e). Fasten the slide r

Page 34

4GLOBALINDUSTRIES, INC.10239999F2013-12-02 WarrantyGlobal Industries Inc. (the Company) makes the following warranty to the initialretail purchaser of

Page 35

40015885 rev 10-00STEP 25Install the grain bands according to the appropriatelayout on page 31. Attach the perforated band atthe inner ring to the roo

Page 36

41015885 rev 10-00STEP 26Raise the bin and add the third full sidewall ring.The outside ladder needs to be assembled as thebin is being raised. Refer

Page 37

42015885 rev 10-00STEP 29Refer to the system layout drawing on page 23for the platform location. Bolt the upper fanplatform bracket inside the stiffe

Page 38

43015885 rev 10-00015083 - 80” standard platform rail015084 - 56” rail on a center platform015085 - 80” standard toeboard015086 - 56” toeboard ona cen

Page 39

44015885 rev 10-00STEP 32 (2 fan units only)The step across platform will be positionedbetween the two fan platforms. Locate thesupport angles and br

Page 40

45015885 rev 10-00STEP 34The access doors to the bin are located inthe second ring from the bottom (32” door)or in the second and third rings from th

Page 41 - STEP 28

46015885 rev 10-00STEP 36Install the bottom ring of sidewall sheets, makingsure the floor flashing holes are at the properheight to match the floor s

Page 42 - STEP 30

47015885 rev 10-00 STEP 40Install the anchor clip keeper at the vertical seams ofthe bottom sidewall ring. The bottom leg of the keeperwill fit

Page 43

48015885 rev 10-0024' Ezee Dry Sidewall GagesRingColorCode11 1/2Rings10 1/2Rings9 1/2Rings8 1/2Rings7 1/2Rings30'-5" 27'-9" 2

Page 44 - STEP 33

49015885 rev 10-0030' Ezee Dry Sidewall GagesRingColorCode11 1/2Rings10 1/2Rings9 1/2Rings8 1/2Rings7 1/2Rings30'-5" 27'-9" 2

Page 45 - STEP 35

015885 rev 10-005MaintenanceVirtually the only thing that will limit the useful life of your bin is rust. MFS/YORK/STORMORhas specified a galvanized c

Page 46 - STEP 39 (Vac-U-Vents only)

50015885 rev 10-00Ladders42ladder installationPreread the entire ladders section (pages50 - 53) before installing the ladders.Refer to the ladders, s

Page 47

51015885 rev 10-00inside ladderladder sectionladder splice5/16” bin bolt,hex nut & washerINSIDE LADDER ASSEMBLYgTOP VIEW OF LADDER SPLICEdladder s

Page 48

52015885 rev 10-0043installing ladder extension railsExtension rails are provided as anoption for means to walk “through”the ladder on to the roof ste

Page 49

53015885 rev 10-00extension railladder extensionbraceextension connectoroutside ladderbracketladder cageuprightladder caged-ringd-ring at extensionsta

Page 50

54015885 rev 10-00OperationPrior to filing your new bin for the first time, you should check the following:1. All bolts are in place and properly tigh

Page 51 - TOP VIEW OF OUTSIDE LADDER

55015885 rev 10-00solenoid valve(018103)strainer pipe(018141)transducer(018106)pumppulley(018112)belt(068011)electronic switchassembly (018105)3/8” ch

Page 53

57015885 rev 10-00Dryer Component Parts ListPart Number Description Part Number Description015001 18' Tension Ring Segment 015284 Flashing015002

Page 54 - Operation

58015885 rev 10-00Roof PartsPart No. Description011400 40" Roof cap011401 Roof cap flashing011402 36" Peak ring011404 18' Standard roof

Page 55

59015885 rev 10-00StiffenersPart No. Description015107 Top 2 ring stiffener015106 Intermed/Btm 2 ring stiffener015251 Bottom 1 ring stiffenerDoor Part

Page 56

015885 rev 10-006Important Safety InformationThis MFS/YORK/STORMOR Construction/Safety Manual is written to assist and instruct those whoare responsib

Page 57

60015885 rev 10-00HardwarePart No. Description018008 50' Roll of sealer tape018020 Large "S" hook90031014 1/4" Cable clamp068830 1

Page 58

61015885 rev 10-00Significant changes from the last printing are:1. Page 3: The Table of Contents was revised.2. Page 17: The typical aeration fan dim

Page 59

MFS / YORK / STORMORP. O. Box 2105 • 2928 East Highway 30Grand Island, Nebraska 68801, U.S.A.(308) 384-9320 • FAX (308) 382-6954www.mfsyork.comfor inf

Page 60

015885 rev 10-007OPERATOR QUALIFICATIONSOperation of this unit shall be limited to competent and experienced persons. In order to bequalified, he must

Page 61

8015885 rev 10-00Decal I.D. & PlacementPut on sidewall sheet bundles before shipped.If augers manufactured by othersare installed in conjunction w

Page 62 - MFS / YORK / STORMOR

9015885 rev 10-00CAUTIONTHIS BIN IS LIMITED TO ONE OF THE FOLLOWING USAGES AS LISTED BELOW - IMPROPER USAGE WILLVOID ANY STATED WARRANTY APPLICABLE TO

Commentaires sur ces manuels

Pas de commentaire